Skip to content

Lantern, a worked example · Record

SCN-ASMT-SCHEDULE: Accept an eligible schedule

An invented example

This Atlas is drawn from the records of an invented product, so it can be published to show what the Atlas shows. A team's own Atlas may contain internal and restricted records and stays inside the organization. The files are authoritative; these pages are a derived view of them.

Snapshot: commit unknown · graph hash 3b31c362b352 · level L1 · scope examples/scheduling/**

Records › Scenarios › SCN-ASMT-SCHEDULE

The record

examples/scheduling/SCN-ASMT-SCHEDULE.md · View the file on GitHub

Field Value
ID SCN-ASMT-SCHEDULE
Title Accept an eligible schedule
Type scenario
Status draft
Delivery not stated
Owner team-assessment
Visibility internal
Audiences engineering, product
Revision 1
Illustrates BEH-ASMT-SCHEDULE
Format spec 0.2 · profile intentset/scenario/0.2

Given

An authorized teacher, a published assessment, and a future release time.

When

The teacher schedules the assessment for a class they manage.

Then

The system records the schedule and does not expose the assessment to students before its release time.

Everything below is derived: the Atlas reads it from this record and the others, and none of it is written in the file.

Linked from other records

The links other records write to this one, read the other way (Core §5).