Intentset implementation roadmap v0.1

Planning status: proposed sequence, not a committed release schedule. Indicative effort assumes one dedicated TypeScript engineer with regular product, architecture, and QA review. Parallel staffing may change duration; acceptance gates matter more than calendar estimates.

Product strategy

Prove that one real behavior can be found, implemented, verified, reviewed, and explained through one connected model. Build trustworthy validation before a large editor or hosted graph. Git remains the system of record. Markset publication and agent context are first-class outputs; neither replaces semantic validation.

Milestones

Milestone Indicative effort Deliverables Exit criteria / dependency
M0 Resolve foundations 1 week Model decisions; pinned Markset contract; chosen license/governance Ownership and publication rules accepted; no unresolved carrier ambiguity
M1 Core model and parser 2–3 weeks TypeScript parser, schemas, typed graph, diagnostics; init, validate, JSON export Valid/invalid fixtures pass; safe YAML handling; deterministic output; ID/link/cycle checks; requires M0
M2 Traceable architecture pilot 2–3 weeks Slice/path/resource registry resolver, import checks, architecture check, CI baseline Real pilot owner/path coverage; alias bypass/cycle/overlap fixtures fail correctly; requires M1
M3 Verification and impact 2 weeks Test adapters, evidence records, impact, review diff Current/stale/fail/skip distinction; changed rules flag dependent knowledge; real pilot tests bound to snapshot; requires M2
M4 Markset knowledge and Atlas 2–3 weeks Version-pinned renderer adapter, capability/behavior views, audience projection, review, serve Public/customer/internal fixtures demonstrate isolation; source provenance; manual knowledge review; requires M3
M5 Agent context and alpha 1–2 weeks Read-only MCP/context tools, packaged CLI, adoption guide, public alpha docs External adopter completes pilot; customer context cannot access raw engineering graph; reproducible tagged build; requires M4

Indicative total: 10–14 engineering weeks plus reviews. M0 must revise estimates after source inspection. Launch specifications for feedback earlier, clearly labeled drafts; defer installation claims until packages exist.

M0 decisions to close

Reference toolchain boundaries

Component Responsibility First milestone
parser Safe frontmatter + Markdown source/provenance M1
core/schema Types and semantic constraints M1
graph ID resolution, inverse edges, snapshot serialization M1
validator Deterministic diagnostics and conformance scope M1
architecture File claims, import graph, resources, exceptions M2
verification Definition/run adapters, coverage classification M3
impact Explainable dependency traversal and snapshot diff M3
publisher Audience/version projection + reviewed Markset M4
atlas Progressive human review views M4
cli Cohesive local commands and JSON reports M1 onward
mcp Authorized read/context API over existing services M5

Packages can start as modules in a small workspace. Do not create separate publishable packages until their API boundaries stabilize. The specification and conformance fixtures must remain usable by implementations in other languages.

Proposed command contract

Commands below are design targets, not currently installable commands.

intentset init                         # create local config and small sample
intentset validate                    # schema and graph checks
intentset graph --format json          # deterministic export
intentset architecture check           # ownership and import boundaries
intentset impact BEH-ASMT-SCHEDULE      # explained affected set
intentset review                       # local review report
intentset context BEH-ASMT-SCHEDULE     # bounded engineer context
intentset serve                        # local Atlas
intentset mcp                          # read-only agent interface

Use common config discovery, exact versioned output schemas, 0/1/2 exit codes, and machine-readable diagnostics. Network writes, cloud deployment, and publication must be separate explicit operations. A validation command must not mutate source files.

Definition of alpha done

An adopter can clone a tagged release, define a capability with multiple behaviors, connect owners and real tests, obtain understandable failure diagnostics, review changes in an Atlas, and generate safe Markset knowledge for an exact release. CI rejects a deliberate missing owner, illegal import, stale evidence claim, and internal-text publication attempt. A second implementation can consume exported graph/schema fixtures without importing the TypeScript parser.

The demo should show a change to a scheduling rule propagating to implementation review, verification, and knowledge review. It must visibly distinguish implemented tooling from mock UI and recorded evidence from fabricated coverage percentages.

Pilot backlog

  1. Inventory known architecture and release dimensions; record repository-policy discrepancies.
  2. Model one bounded capability with 3–5 behaviors only if the real pilot supports that scope.
  3. Add one success, rejection, and authorization scenario per relevant behavior.
  4. Bind existing tests; add checks only where a meaningful behavior gap exists.
  5. Resolve source/backend/resource ownership and prove an illegal dependency is caught.
  6. Produce a capability review showing unresolved gaps honestly.
  7. Publish one customer guide with safe citations and release filtering.
  8. Have a second engineer locate and change a behavior using only the model/context output.

Later, after alpha evidence

Consider editor assistance, richer graph navigation, release comparison, additional language/cloud profiles, Jira/Streamlane adapters, ReqIF/OSLC interoperability, and a Markset symbolic-reference proposal. Defer a hosted collaboration platform, automatic “truth” inference, repository-wide mass migration, and mandatory adoption of all portfolio products.

Open-source operations

Before public release, add the approved LICENSE, contribution guide, code of conduct, security reporting channel, maintainer decision process, release checklist, and compatibility policy. Public specification changes should include motivation, migration impact, and conformance fixtures. Breaking semantic changes require a specification version change; patch corrections must not silently change valid graph meaning.

Measure time to answer “what implements this behavior?”, false-positive rate of checks, percentage of reviewed behavior changes with current evidence, publication rejection correctness, and independent adoption success. Popularity metrics alone do not validate the framework.